ExaInfra is India's sovereign intelligence terminal for CPWD DSR 2026 turnkey construction cost estimation, branded material quantities across 16+ cities, high-stakes property legal audits, and statutory tax calculations.
Real-time building cost calculation for residential & commercial projects across 15+ Indian cities. Computes structural steel, cement, aggregates, finishing, and masonry labor based on CPWD thumb-rules, branded material overrides, and contractor escrow milestones.
Define project carpet area, built-up ratio, and building height
Select specification grade from standard CPWD budget to ultra-luxury
OPC/PPC Cement, ISI Fe-500D Steel, Red Clay Bricks, Standard Vitrified Tiles (2x2), Sal Wood & UPVC windows.
UltraTech / ACC Super, Tata Tiscon Fe-550D, AAC Blocks, 4x2 GVT Tiles, Teak Frame & Branded CP fittings.
UltraTech Super, Tata Tiscon, Italian Marble / Granite, Burma Teak Joinery, Kohler/Grohe Fittings, Acoustic Glazing.
Tier 1 & Tier 2 pricing indices calibrated with regional material & labor rates
Custom brand presets for Cement, Steel, Bricks, Sand, Flooring, Joinery & Labor
Real-time physical bill of materials calculated from your built-up area under IS 456 & CPWD DSR norms
Mandatory Indian standard design mixes, clear cover depths, and lap rebar ratios
| Structural Member | Design Mix | Nominal Ratio | Clear Cover |
|---|---|---|---|
| Footings / Raft Slab | M25 | 1 : 1 : 2 | 50 mm (Corrosion barrier) |
| Columns & Shear Walls | M25/M30 | Design Mix | 40 mm (Fire/axial load) |
| Plinth & Roof Beams | M20/M25 | 1 : 1.5 : 3 | 25 mm (Tension face) |
| Floor & Terrace Slabs | M20 | 1 : 1.5 : 3 | 15–20 mm (Spacers) |
| Sub-base / PCC Bed | M10/M15 | 1 : 3 : 6 | 75 mm (Mud mat) |
Standard NBC & CPWD baseline distribution (Materials vs. Labor)
Quantities calculated using CPWD DSR 2026 thumb rules
| MATERIAL / TRADE | GRADE & BRAND STANDARD | QUANTITY | UNIT RATE | SUBTOTAL | SHARE |
|---|---|---|---|---|---|
| GRAND TOTAL ESTIMATED TURNKEY COST | ₹30,75,759 | 100% | |||
Critical field checkpoints before casting, during concreting, and post-curing