Flagship Construction Cost Estimator,
Material BoQ

ExaInfra is India's sovereign intelligence terminal for CPWD DSR 2026 turnkey construction cost estimation, branded material quantities across 16+ cities, high-stakes property legal audits, and statutory tax calculations.

16+ Cities
CPWD DSR 2026 Cost Indices
28,400+
Title & Khata Audits
₹4,850 Cr+
Asset Value Screened
100% Legal
Section 65B Certified Proof
★ EXAINFRA NATIONAL FLAGSHIP TERMINAL
CPWD DSR 2026 • NBC 2016 • IS 456 M20/M25 CONCRETE NORMS • 16 CITIES INDEXED
EXAINFRA.IN — NATIONAL CONSTRUCTION INTELLIGENCE TERMINAL
Official Construction Cost Estimate & Bill of Quantities (BoQ) • CPWD DSR 2026 & NBC 2016 Compliant
EXA-EST-2026-8942
Date: 25 Oct 2026

Interactive Construction Cost Estimator & Material BoQ

Real-time building cost calculation for residential & commercial projects across 15+ Indian cities. Computes structural steel, cement, aggregates, finishing, and masonry labor based on CPWD thumb-rules, branded material overrides, and contractor escrow milestones.

1

Area & Structural Scope

Define project carpet area, built-up ratio, and building height

ℹ️
Carpet Area (RERA Sec 2(k)): Net usable floor area of an apartment/building excluding external walls and service shafts. Structural calculations automatically estimate Built-up Area = Carpet × 1.25–1.35x.
Min: 100 sq.ft • Step: 10
sq.ft
CARPET AREA 1,500 sq.ft
→
ESTIMATED BUILT-UP AREA 1,950 sq.ft
TOTAL FLOORS 2 Levels (G+1)
2

Construction Quality & Spec Tier

Select specification grade from standard CPWD budget to ultra-luxury

Standard / Budget ~₹1,720 / sq.ft

OPC/PPC Cement, ISI Fe-500D Steel, Red Clay Bricks, Standard Vitrified Tiles (2x2), Sal Wood & UPVC windows.

RECOMMENDED
Premium / Semi-Luxury ~₹2,280 / sq.ft

UltraTech / ACC Super, Tata Tiscon Fe-550D, AAC Blocks, 4x2 GVT Tiles, Teak Frame & Branded CP fittings.

Luxury / Ultra ~₹3,350 / sq.ft

UltraTech Super, Tata Tiscon, Italian Marble / Granite, Burma Teak Joinery, Kohler/Grohe Fittings, Acoustic Glazing.

3

Location Selection & Cost Index

Tier 1 & Tier 2 pricing indices calibrated with regional material & labor rates

📍 Bhopal Multiplier: 0.96x (-4% vs Base) Tier 2 Central Market • Low Freight Premium
4

Material Brands & Trade Selectors

▼ Expand Overrides

Custom brand presets for Cement, Steel, Bricks, Sand, Flooring, Joinery & Labor

💡 Overrides allow you to swap specific brands (e.g. Tata Tiscon vs JSW) or switch from Red Clay Bricks to AAC Blocks. Prices automatically scale with the selected city index.
5

Live Site Material & Labor Quantities

Real-time physical bill of materials calculated from your built-up area under IS 456 & CPWD DSR norms

🧱
Structural Cement 819 Bags (50kg) ~0.42 bags/sq.ft (53G OPC + PPC)
🏗️
TMT Steel (Fe-550D) 7.8 MT (7,800 kg) ~4.0 kg/sq.ft (Primary & stirrups)
⏳
Plaster & Concrete Sand 39.0 Brass (3,900 cft) ~2.0 cft/sq.ft (Zone-II washed)
🪨
Coarse Aggregates (10/20mm) 28.3 Brass (2,828 cft) ~1.45 cft/sq.ft (Crushed granite)
🏠
Wall Masonry Units 2,243 AAC Blocks 600×200×150mm precision blocks
💧
Curing & Concrete Water 263.3k Litres (IS 456) Potable standard (14-day wet cure)
👷
Civil Labor Deployment ~1,404 Total Man-Days Masons, bar-benders, shutterers & helpers (CPWD benchmark)
6

Structural Design & IS 456 Standards

Mandatory Indian standard design mixes, clear cover depths, and lap rebar ratios

Structural Member Design Mix Nominal Ratio Clear Cover
Footings / Raft Slab M25 1 : 1 : 2 50 mm (Corrosion barrier)
Columns & Shear Walls M25/M30 Design Mix 40 mm (Fire/axial load)
Plinth & Roof Beams M20/M25 1 : 1.5 : 3 25 mm (Tension face)
Floor & Terrace Slabs M20 1 : 1.5 : 3 15–20 mm (Spacers)
Sub-base / PCC Bed M10/M15 1 : 3 : 6 75 mm (Mud mat)
📌 IS 456:2000 MANDATORY LAP & CURING RULES
  • Lap Length Formula: Minimum 50d (50 × bar diameter) in tension zones (slabs & beam bottoms); 40d in compression zones (columns). Lap staggered at max 50% in any section.
  • Mandatory Curing Period: Minimum 10 to 14 days continuous ponding/wet hessian curing for OPC cement, 14 days for PPC/fly ash blended cement to avoid thermal shrinkage hairline cracks.
TENTATIVE ESTIMATED TURNKEY CONSTRUCTION COST ±6% MARKET BUFFER
₹28,90,000 – ₹32,60,000
MEDIAN BASELINE ESTIMATE ₹30,75,000
RATE PER SQ.FT (BUILT-UP) ₹1,577 / sq.ft
RATE PER SQ.FT (CARPET) ₹2,050 / sq.ft
Carpet: 1,500 sq.ft Built-Up: 1,950 sq.ft Structure: G+1 (2 Levels) Location: Bhopal (0.96x) Tier: Premium

Cost Allocation & Trade Breakdown

Standard NBC & CPWD baseline distribution (Materials vs. Labor)

MATERIALS ~64% • LABOR ~36%
TOTAL ₹30.7L

Itemized Material & Labor BoQ Table

Quantities calculated using CPWD DSR 2026 thumb rules

↔ Swipe table to view full rates
MATERIAL / TRADE GRADE & BRAND STANDARD QUANTITY UNIT RATE SUBTOTAL SHARE
GRAND TOTAL ESTIMATED TURNKEY COST ₹30,75,759 100%
📐
Standard Civil Engineering Thumb Rules (per sq.ft of Built-Up Area)
Hover ℹ️ icons for IS Codes & Norms
Structural Steel (TMT):
ℹ️
IS 1786 & IS 456 Norm: Framed RCC structures (slabs, columns, plinth & beams) require 3.5 to 4.5 kg of Fe-500D/Fe-550D steel per sq.ft of built-up area (~24% baseline cost share).
~3.5 to 4.5 kg / sq.ft (Fe-550D Rebars)
Cement:
ℹ️
IS 456 M20/M25 Design Mix: Slabs and RCC members use 53G OPC; brickwork and plastering use PPC. Requires ~0.40 to 0.45 bags (50kg) per sq.ft of built-up area (~16% cost share).
~0.40 to 0.45 bags (53G OPC/PPC)
Sand / Fine Aggregate:
ℹ️
Zone-II Plaster & Concrete Sand (IS 383): Natural river sand or manufactured VSI M-Sand. 1.8 to 2.2 cu.ft per sq.ft (100 cu.ft = 1 Brass).
~1.8 to 2.2 cu.ft (River/M-Sand)
Coarse Aggregate:
ℹ️
IS 383 Granite Metal: Machine crushed 10mm & 20mm graded coarse aggregate for high compressive strength concrete.
~1.3 to 1.5 cu.ft (10mm/20mm)
Bricks / AAC Blocks:
ℹ️
IS 2185 & IS 1077 Masonry: Perimeter 9" walls & 4.5" partitions require ~20 clay bricks or ~2.4 AAC lightweight blocks per sq.ft of built-up area.
~18 to 22 Bricks (or 2.4 AAC Blocks)
Turnkey Civil Labor:
ℹ️
CPWD DSR 2026 Manday Norms: Comprehensive structural civil labor (masons, bar benders, shuttering carpenters & site supervisor) constitutes ~26% of turnkey costs.
~26% of overall turnkey construction

5-Phase Contractor Milestone Escrow Schedule

🛡️ FUNDS DISBURSED IN TRANCHES UPON ARCHITECT CERTIFICATION
7

Turnkey Site QA/QC Inspection Protocol

Critical field checkpoints before casting, during concreting, and post-curing

✓
Pre-Pouring Shuttering & Reinforcement Check
Verify formwork line, level, and plumb. Inspect PVC/mortar cover blocks (never marble/stone pieces). Verify electrical conduits and plumbing sleeves are tied prior to casting.
✓
Transit Slump Cone Test (IS 1199)
Permissible slump: 75 mm to 100 mm for manually poured concrete; 100 mm to 125 mm for pumpable RMC mix. Strictly prohibit drivers or labor from adding site water.
✓
Compressive Concrete Cube Testing (IS 516)
Minimum 6 cubes (150×150×150mm) cast per 15 m³ batch. 3 cubes crushed at 7 days (≥67% strength), 3 cubes tested at 28 days (≥100% design strength) in NABL lab.
✓
72-Hour Sunk Slab Water Ponding Test
Fill 2 inches of water in all bathroom sunken portions, kitchen utility, and terrace slabs. Inspect underside for dampness or seepage before tiling or plumbing concealment.
✓
Crack-Arresting Wire Mesh on Masonry Joints
Fix 150mm wide GI chicken wire mesh or fibreglass mesh across all RCC column/beam to brickwork joints prior to internal and external plastering.